[CANCELLED] Road repair works – B4367 Lingen Bridge to Hereford/Worcester Boundary

5th January 2023

We are planning to carry out road repair work at B4367 Lingen Bridge to Hereford/Worcester Boundary. Fully signed daytimes diversions will be in place 19 to 27 January between 9.30am-4.00pm (Mon-Sat).

Access to residential and business properties within the works will be maintained during closuresWorkmen on site will direct you to the safest entry point through the works and route to your destination. This may be from the furthers side to your destination. There may be some delay to your journey as things are made safe.

For more information please visit: https://one.network/?GB130749848

Please note that all our planned roadworks are subject to change due to weather conditions or unforeseen circumstances. Any changes will be displayed on the yellow advanced warning signs and on https://one.network/

Last modified: 26th January 2023

Leave a Reply

Skip to content